The VoIP Lounge 25 Foot Flat Black Long Handset Receiver Curly Phone Cord with Long Lead

★★★★★ 4.9 64 reviews

US$4.00
Price when purchased online
Free shipping Free 30-day returns

Sold and shipped by torrentemoreno.com
We aim to show you accurate product information. Manufacturers, suppliers and others provide what you see here.
US$4.00
Price when purchased online
Free shipping Free 30-day returns

How do you want your item?
You get 30 days free! Choose a plan at checkout.
Shipping
Arrives Nov 5
Free
Pickup
Check nearby
Delivery
Not available

Sold and shipped by torrentemoreno.com
Free 30-day returns Details

Product details

Management number 239186630 Release Date 2026/07/14 List Price US$4.00 Model Number 239186630
Category

The VoIP Lounge Universal Flat Black 25 Foot Handset Cord with long lead. This is a flat black cord that is 25 feet long when it is fully extended to its maximum length, and is about 42 inches in its coiled, unstretched state. Handset cords are rarely used at their maximum length, and most typically usable anywhere from 35% to 75% of their advertised length, depending on how much you want to stretch them. Once stretched to the maximum length, cords do not retain their original shape or quality, so it's important to choose wisely when buying. The advertised size of the full maximum extended length is a Telecom Industry Standard, and not something that is decided by us, or any other manufacturer or seller. Cords & Lengths: Available lengths for most cords are: 7 feet (11 inches coiled / unstretched) 9 feet (15 inches coiled / unstretched) 12 feet (22 inches coiled / unstretched) 25 feet (42 inches coiled / unstretched)

  • 25 Feet fully stretched, 3.5 Feet coiled (See Full Description Below)
  • Black Color
  • Brand New - Individually Bagged
  • Please read the description regarding Telecom Industry Standard Cord Lengths
UPC 696861475547
ASIN B07FK33KRY
Color Black
Model 5582667555
Brand Name The VoIP Lounge
Cable Type Handset cord
Item Shape Round
Model Name 5582667555
Unit Count 1 Count
Item Length 25 Feet
Item Weight 0.1 Kilograms
Part Number TVLUNV25FB
Manufacturer The VoIP Lounge
Connector Type RJ9
Number of Pins 4
Maximum Voltage 5 Volts (DC)
Connector Gender Male-to-Female
Specification Met Industry Standard
Compatible Devices Telephone Base
Indoor Outdoor Usage Indoor
Customer Package Type Individually Bagged
Compatible Phone Models No Compatible Phone Models
Connectivity Technology Handset cord
Recommended Uses For Product connecting telephone handsets to telephone bases
Other Special Features of the Product Tangle Free

Correction of product information

If you notice any omissions or errors in the product information on this page, please use the correction request form below.

Correction Request Form

Customer ratings & reviews

4.9 out of 5
★★★★★
64 ratings | 26 reviews
How item rating is calculated
View all reviews
5 stars
89% (57)
4 stars
1% (1)
3 stars
0% (0)
2 stars
0% (0)
1 star
10% (6)
Sort by

There are currently no written reviews for this product.